美国
美国

myGeobrugg

Nesselwängle bei Reutte

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The UX120-H6 debris flow barrier protects paths and woodland trails against becoming blocked. Farmers are also happy that no further flood damage will be able to occur in the meadows in the future. Residents are pleased that they will no longer have to clear deposits from from their gardens and sludge from their homes. Everyone in the area can therefore now sleep soundly again.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The catchment area of the Schmalecklesbach above Nesselwängle is at high risk of debris flow and the transportation of driftwood toward the settlement area.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

Until now, deadwood that has been carried along has clogged up this path below the woodland trail.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The mudslide rapidly dug its path, pouring out over the meadows and into the neighboring residential area.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The WLV Ausserfern is located around 10 meters uphill of the woodland and hiking trails which lead to the mountain cabin often frequented by tourists – an ideal place for installing a net barrier.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

Thanks to the raised ramp, the drilling works were taken care of quickly and without great difficulty using a digger with a mounted drill boom.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The drilled, 5-meter-long Titan 40/16 hollow bar anchors were pressed in with anchor grout and their flex heads screwed on. To transfer any lateral forces to the subsoil and to protect the bar anchors from bending, the flex heads were cast in reinforced foundations at a slight angle.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

After tensioning the support ropes with the energy-absorbing braking rings provided, both supports are positioned. The upper span of this 6-meter-high UX120-H6 debris flow barrier is 23 meters.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The 95 m² nets are shackled to the support ropes, completing the installation of the debris flow barrier.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

A freeboard of around 0.8 meters on the underside of the lower support ropes ensures free flow at times of low flow in the stream. Beneath the lower support ropes, relatively loose rings hang down to the bed of the stream in order to filter entrained branches, even in low water.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

A blockage of this path will no longer occur in the future.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The officers at the WLV do not anticipate that this debris flow barrier will overflow. There is therefore no protection against abrasion on the upper support ropes. The flex heads, which are embedded in concrete in the foundation, are capable of bending up to 30 degrees on all sides in the vicinity of the anchor head without compromising their load capacity or ability to provide protection against corrosion.

泥石流和滑坡防护 - Nesselwängle bei Reutte 2010

The installed UX120-H6 debris flow barrier with a retention capacity of around 700 m³ protects the residents of Nesselwängle.

 

系统

 

系统长度

23 m

 

安装年份

2010

情况

In the fall of 2009, heavy local rainfall above Nesselwängle was responsible for the accumulation of debris caused by flooding. The inconspicuous Schmalecklesbach stream brought debris, humus, and deadwood down into the valley. A high proportion of deadwood led to logs becoming jammed. The woodland and hiking trail leading to the mountain cabin was washed away. The rock settled at the lower levels of meadowland and in the gardens neighboring the settlement.

描述

Following a consultation with Geobrugg, the regional site management of the WLV Ausserfern service for torrent and avalanche control decided to make this region the first to acquire a barrier system against falling rock.

The geometry and the slopes of the Schmalecklesbach stream, positioned some 10 meters above the woodland trail, provide an ideal location for the installation of a debris flow barrier. The slopes of weathered, loosened, or solid dolomite rock ensure that the earth cannot work itself free at the sides. The UX120-H6 barrier is designed with two supports to provide optimum protection for the overall height of 6 meters and with an upper span of 23 meters, should an incident occur.

By opening the nets, the barrier can be cleared out from the existing woodland trail following debris flow from the valley.

客户

Wildbach- und Lawinenverbauung WLV Ausserfern

承包商

Wildbach- und Lawinenverbauung WLV Ausserfern

防护对象

Touristic infrastructure, Residential area, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Wildbach- und Lawinenverbauung WLV Ausserfern

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址