美国
美国

Monserrate Walking path, Project Stage 2

Sendero Peatonal acceso Santuario de Monserrate, 110311, Bogota Monserrate Walking Path, 哥伦比亚
2017
客户
IDIGER (Instituto distrital de gestion del Riesgo)
承包商
National Army of Colombia
防护对象
Touristic infrastructure
能级
3000 kJ
系统的高度
4.0 m
系统长度
35 m - 70 m
腐蚀保护
Galvanized, GEOBRUGG SUPERCOATING
情况

The sanctuary of Monserrate is adjacent to Bogota and an important recreation area for the city. The bush fire in 2015 destroyed the vegetation and the soil cover. Thus blocks of rock were exposed and the danger of accidents rose.

Due to this threat, the road was completely closed. A solution that would provide safety, comfort, and durability had to be found to protect the over 2 million people mounting up the hill throughout the year.

描述

EL IDIGER institute evaluated systems to control the rock falls in order to to re-open the path. WARCO SAS and Geobrugg advised during the design and provided the rockfall barriers. Finally five barriers were installed along the trail to cover the exposed areas. Installed RXE-3000 barriers are 4 m high and have a total length of 215 m.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国