瑞士
瑞士

myGeobrugg

Military Base Protection - Facatativá

落石防护 - Military Base Protection - Facatativá 2016

Frontal view of the barrier

落石防护 - Military Base Protection - Facatativá 2016

During installation

落石防护 - Military Base Protection - Facatativá 2016

Side view of the barrier

落石防护 - Military Base Protection - Facatativá 2016

Installed rockfall protection barrier GBE-100A-R

 
 

系统长度

50 m

 

安装年份

2016

情况

The Colombian National Army was looking for a system capable of holding back blocks that fell onto one of its facilities. Users and workers at the building were at risk due to the proximity to the slope.

描述

WARCO/Geobrugg consulted, supplied and installed a rockfall barrier GBE-100A-R of 50 meters length and 2 meters height.

客户

Ejercito de Colombia

承包商

WARCO S.A.S

防护对象

Building

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址