美国
美国

myGeobrugg

Milibach Torrent, Hasliberg, Canton of Bern

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact - view from downstream

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Satellite image of the storm that moved across the northern Swiss Alps on October 10 (source: SF Meteo website)

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Partially engaged UX-barrier - ready for more

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Event mapping

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Erosion and slope instability

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Staking

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Drilling with a specially equipped excavator

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Installing flexheads

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Foundation with installed flexheads

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Ring net ready to be placed

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Connecting the ring net to the ropes

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Final assembly of the components

泥石流和滑坡防护 - Milibach Torrent, Hasliberg, Canton of Bern 2011

Anchor test

 

系统

 

系统长度

500 m - 7 m

 

安装年份

2011

情况

In August 2005, a storm in the Weiler Reuti and in Meiringen had caused serious debris coverage and severe damage. To protect the two settlements, a cascade comprised of 13 flexible debris flow barriers was installed to retain a cumulative volume of up to 10,000 m³ was installed.

On October 10, 2011, heavy rainfall triggered a shallow landslide containing a total of 2,000 m³ of schist in the drainage area of the Milibach river. Approximately 80 mm of rain had fallen onto a 70 cm layer of existing snow in 12 hours. The Swiss Federal Office for Environment (FOEN) categorized these heavy rainfalls as the 100-year event.

描述

This multilevel debris flow barrier system successfully retained an estimate 2,000 m³ of debris from the October 2011 100-year event before the slide had any opportunity to gain momentum and cause significant damage, as had happened in 2005. The event filled barrier no. 2 completely and barrier no. 5 partially. Barrier 1, which was situated above where the shallow landslide was triggered, remained unaffected, while barriers 3 and 4 were not filled as they have a higher basal opening.

Stopping the 2,000 m³ of debris helped prevent further erosion along the unstable banks of the Milibach River and dissipated an event that could have caused damage to the settlements further downstream. After an in-depth investigation during an on-site inspection, the customer decided to leave barrier no. 2 filled to protect the riverbanks. The debris held by barrier no. 5 is also being left and should be carried away over time as the water drains naturally.

客户

.

腐蚀保护

GEOBRUGG SUPERCOATING

其他安装的应用程序

泥石流和滑坡防护

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址