美国
美国

myGeobrugg

Merag Ferry Port - Island of Cres

落石防护 - Merag Ferry Port - Island of Cres 2025

Installation of the rockfall barrier, secondary mesh grants protection from gravel

落石防护 - Merag Ferry Port - Island of Cres 2025

Access road to the port, rockfall protection with GBE-2000A

落石防护 - Merag Ferry Port - Island of Cres 2025

One field barrier ROCCO-2000

落石防护 - Merag Ferry Port - Island of Cres 2025

Keeps the loose gravel in place - slope stability with TECCO® G45/2

落石防护 - Merag Ferry Port - Island of Cres 2025

Attendance line for the ferry boat, protection from smaller rocks with fine, high-tensile TECCO® G45/2 mesh

落石防护 - Merag Ferry Port - Island of Cres 2025

Slope stabilization with TECCO® G45/2

 
 

系统长度

12 m - 80 m

 

安装年份

2025

情况

The access road DC101 to the Merag ferry port on the island of Cres was exposed to frequent rockfall risk due to steep, weathered karst slopes above a heavily trafficked road. During peak summer periods, even small rockfall events posed serious danger to people, vehicles, and uninterrupted ferry operations. Traditional protection measures were insufficient for high-energy and complex impact scenarios, including simultaneous and eccentric block impacts. The installation of active slope stabilization with TECCO G45/2 mesh, combined with GBE-2000A and the ROCCO-2000 barrier, addressed both rock detachment and extreme impact conditions. This integrated solution transformed a high-risk bottleneck into a resilient and safe access route to critical island infrastructure.

描述

Raised safety level on the access road to the Merag ferry terminal
The project focused on protecting the road DC101 from potential rockfalls and slope instabilities.

Installed solutions are:

  • GBE-2000A rockfall barrier (H = 5 m, L = 80 m)
  • TECCO G45/2 high-tensile steel mesh (11,115 m²) for active slope stabilization, slope height 5-15 m, inclination 60-75°, Limestone and Dolomite,

    and as a remarkable milestone of this project is the first installation in the Balkans of a
  • ROCCO-type barrier (ROCCO-2000), with a height of 5 m and a length of 12 m (one-field barrier)

国家/地区

克罗地亚

工程

rijekaprojekt d.o.o.

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国 Regional Manager California

联系地址

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

自然災害防護
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / 美国 Regional Sales Manager Pacific Northwest and Hawaii

联系地址