语言:
中文zh
美国
我的布鲁克

登记处

还没有账户,需要注册吗?

现在注册
布鲁克集团成员
美国
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg
Lockstein 2017 - Geobrugg Lockstein 2017 - Geobrugg

Lockstein

查看谷歌地图中的地址  分享
邮编:
83471
地点:
Berchtesgaden
国家/地区
德国
安装年份:
2017
客户
Markt Berchtesgaden Community
工程:
Dipl.-Ing. Bernd Gebauer Ingenieur GmbH
承包商:
HTB Baugesellschaft m.b.H.
防护对象
Touristic infrastructure, Infrastructure, Other
系统
RXE-500-LA
能级
500 kJ
系统的高度
3.0 m
系统长度
29 m - 66 m
腐蚀保护:
Galvanized, GEOBRUGG SUPERCOATING®
情况:

A much-trodden hiking trail in Berchtesgaden with a historic Brine pipeline and a kindergarten underneath were acutely affected by rockfall. The Berchtesgaden market thus put out a tender for the construction of a rockfall barrier in the south-east slope area along the hiking trail to the Lockstein viewpoint café.

Heavy construction traffic cannot operate in this area; there were also no storage or work areas available. In the sector of the fence segments under the forest soil overlay, silty to very silty hillside debris, heavily interspersed with rocks and block parts and in part open-pore rock/block layers had to be contended with.

It was assumed from the local situation, that the thickness of the loose rock cover - hillside debris under the forest soil overlay - was several metres (> 5 m) , so that it could be basically assumed that for the anchor dimensioning, the binding line lies in loose rock throughout.

Soil classification DIN 18 301 (2012) loose soil covering BN 1, BN 2, BS 1 - BS

4; boulders/ outcropping rock FV 2, FV 5, FV 6, FD 2

(According to planning documents of Engineer Bernd Gebauer GmbH,

Traunstein)

描述

Due to the conditions described above, the barriers were installed by hand without machinery.

Anchoring: wire rope anchors 5 m long (lateral) and 4 m long (support anchors) were used. In the looseened rock area, for the lateral anchor rope on the west side flex heads were used instead of wire rope anchors.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
手机: +1 860 377 3230

联系方式

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
手机: +1 505 220 1404

联系方式

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
手机: +1 336 337 0945

联系方式

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Algodones NM 87001 / 美国
Phone: +1 505 771 4080
手机: +1 505 400 0796

联系方式

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards, Geotechnical products, Aquaculture
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / 美国
手机: +1 503 423 7258

联系方式

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
手机: +1 909 706 8964

联系方式

Head office and production
Head office and production
 
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Algodones NM 87001 / 美国
Phone: +1 505 771 4080
手机:  

联系方式