美国
美国

myGeobrugg

边坡稳定 - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

边坡稳定 - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

边坡稳定 - JiJi Tour Line 2020

During installation of the mesh

边坡稳定 - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

边坡稳定 - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 
 

安装年份

2020

情况

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

描述

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

国家/地区

台湾

工程

United Geotech, INC.

承包商

Jin Xin Engineering Co., Ltd.

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国 Regional Manager California

联系地址

Bryant Jackson
 

Bryant Jackson

自然災害防護
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 美国

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

自然災害防護
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / 美国 Regional Sales Manager Pacific Northwest and Hawaii

联系地址