瑞士
瑞士

myGeobrugg

落石防护 - Hurunui 2024

Looking East - attenuator with fixed posts

落石防护 - Hurunui 2024

Looking East - attenuator with fixed posts

落石防护 - Hurunui 2024

Looking West - attenuator support rope separation

落石防护 - Hurunui 2024

Looking West - attenuator support rope separation

落石防护 - Hurunui 2024

Looking West - attenuator with Hurunui river and State Highway 7 (SH7) in the background

落石防护 - Hurunui 2024

Attenuator rockfall protection blends into the scenery

落石防护 - Hurunui 2024

Fantail Bird liking its new playground - Geobrugg Systems work with nature

 
 

系统长度

100 m

 

安装年份

2024

情况

Frequent rockfall onto the Hurunui Bluff Road caused a hazard to the road users.

描述

A fixed post rockfall protection attenuator was installed to redirect and guide rocks down to the toe of the slope. The posts were spaced 15 - 20 metres and placed on the high spots. The drape length was 7 - 9 metres. A support rope separation was installed halfway along, and a bottom rope was installed to control tail kick out. The system was installed efficiently using an excavator drill and Knuckle boom.

国家/地区

新西兰

客户

Private

承包商

防护对象

Road

腐蚀保护

GEOBRUGG ULTRACOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址