瑞士
瑞士

myGeobrugg

落石防护 - Honningsvåg 2012

GBE-3000A - Geobrugg's closest barrier to the North Pole

落石防护 - Honningsvåg 2012

Protected road along the fence

落石防护 - Honningsvåg 2012

Rock face connection - our adaptation to the terrain

落石防护 - Honningsvåg 2012

Thanks to the barrier the road is safe

落石防护 - Honningsvåg 2012

Barrier with boulders

落石防护 - Honningsvåg 2012

The GBE-3000A is made of SIPDER® spiral wire net S4-130 and of TECCO® G80/4

落石防护 - Honningsvåg 2012

The barrier holds back rocks

落石防护 - Honningsvåg 2012

Impact in November 2019, the so-called «steinsprangnett og fanggjerde», the support rope separation did its job

落石防护 - Honningsvåg 2012

Protected road with barrier holding back rock blocks, November 2019

 
 

系统长度

800 m

 

安装年份

2012

情况

Honningsvåg situated in the very North of Norway is its northernmost city. To the Nordkapp (North Cape) it takes a 30 minutes drive. The coastal road was threatened by rockfall.

(steinsprang gjerde)

描述

A GBE-3000A rockfall barrier was installed in 2002 and protects the road since.

客户

Statens Vegvesen

承包商

DS

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址