瑞士
瑞士

myGeobrugg

边坡稳定 - Haigerloch K7177 2015

Another view of the TECCO® SYSTEM³ installation

边坡稳定 - Haigerloch K7177 2015

Detailed view of the protected slope. Visible visual advantages of the TECCO® SYSTEM³.

边坡稳定 - Haigerloch K7177 2015

Fully protected slope

边坡稳定 - Haigerloch K7177 2015

Geological site conditions. Visible limestone layering.

 
 

安装年份

2015

情况

For the town of Haigerloch near Tübingen the district road K7177 connects the lower and the upper town. When a retaining/supporting wall below the road had to be restored parts of the slope were stabilized with TECCO® System.

地質學

Next to a hairpin turn on road K7177, there is a steep rise made of layered limestone with a thickness of up to 0.1 cm. The weather-prone layers consist of steep fractures that cause overhanging layers that have the potential to crash. Shotcrete was not a viable option in these locations due to ecological reasons.

描述

Slopes were nailed and covered with TECCO® System.

客户

Strassenbauamt Haigerloch

承包商

STOTZ Bau GmbH & Co. KG

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

分包商

Engel Bau GmbH

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址