Greenhithe

A226 London Road, DA9 9XQ, Greenhithe, 英国
2022
客户
工程
承包商
防护对象
Railway
腐蚀保护
GEOBRUGG SUPERCOATING
稳定的地区
2350 m²
边坡高度
8 m
边坡坡度从
7 ° - 85 °
防腐蚀垫
Yes
博览会
情况

A sudden landslip in November 2021 was the first indication of underlying instability of the existing chalk cutting on the northern side. Immediate reactive works were needed to clear vegetation and underlying chalk material from the cess and track.

Tony Gee was engaged as the designer to engineer a permanent solution to ensure the stability of the cutting going forward. BAM Ritchies were chosen as the specialist geotechnical contractor to install the solution.

地質學

Lewes Nodular Chalk Formation, Seaford Chalk Formation And Newhaven Chalk Formation (undifferentiated) - Chalk. Sedimentary Bedrock formed approximately 72 to 94 million years ago in the Cretaceous Period. Local environment previously dominated by warm chalk seas.

描述

A solution of TECCO G45/2 mesh was chosen along with TECMAT within the upper half of the slope to provide slope stability and erosion protection. The final solution included 340 rock bolts, the lower half of which were installed from track level during a possession with the help of Pro Rail Services long-reach RRV’s.

本地联系方式

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
自然災害防護, Coastal Erosion Protection, 矿井/隧道
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / 瑞士
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
自然災害防護, 矿井/隧道
Geobrugg AG
Industriestrasse 21
5200 Brugg / 瑞士
Alexander Bittendorfer
Alexander Bittendorfer
Global Project Manager Services
自然災害防護
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / 瑞士
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
自然災害防護, 矿井/隧道
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / 瑞士