瑞士
瑞士

myGeobrugg

泥石流和滑坡防护 - Gaviota Pass 2004

Ringnet barrier at work

泥石流和滑坡防护 - Gaviota Pass 2004

Debris flow barrier

泥石流和滑坡防护 - Gaviota Pass 2004

Ringnet barrier protecting th culvert

 

系统

 

系统长度

13 m

 

安装年份

2004

情况

This drain was regularly blocked by alluvial material.

描述

Installation of a ring net barrier directly in front of the culverts that retains solid material and allows watery, fine material to flow through. The material was retained in the course of three debris flow events without impairing the through traffic. Following excavation the barriers were again fully functional.

客户

-

防护对象

Road

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址