美国
美国

myGeobrugg

泥石流和滑坡防护 - Gaviota Pass 2004

Ringnet barrier at work

泥石流和滑坡防护 - Gaviota Pass 2004

Debris flow barrier

泥石流和滑坡防护 - Gaviota Pass 2004

Ringnet barrier protecting th culvert

 

系统

 

系统长度

13 m

 

安装年份

2004

情况

This drain was regularly blocked by alluvial material.

描述

Installation of a ring net barrier directly in front of the culverts that retains solid material and allows watery, fine material to flow through. The material was retained in the course of three debris flow events without impairing the through traffic. Following excavation the barriers were again fully functional.

客户

-

防护对象

Road

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址