瑞士
瑞士

myGeobrugg

GBE-5000 rockfall barrier

落石防护 - GBE-5000 rockfall barrier 2012

.

落石防护 - GBE-5000 rockfall barrier 2012

.

落石防护 - GBE-5000 rockfall barrier 2012

.

 

系统长度

420 m

 

安装年份

2012

情况

-

描述

For a residential area and its access roads a rockfall protection was required. The installed GBE-5000A rockfall barrier for impact energies of 5’000 kJ is protecting the following sectors from rockfall: Tête de chien, Mont de la Bataille, Culassa, Petite Afrique et Savaric. In addition to the other advantages the Geobrugg GBE-5000A was selected by the client because the barrier is approved in accordance with the guidelines of the European Organisation for Technical Approvals ETAG 027 and carries the CE conformity marking. To keep this rockfall protection as unobtrusive as possible the posts were painted in green.

客户

SIVOM de Villefranche sur Mer – 06 – France

承包商

Groupement Garelli-Sisyphe-Alpharoc – Heaven Climber

防护对象

Road, Residential area

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址