瑞士
瑞士

myGeobrugg

Fierza Hydroelectric Power Station #2

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

系统

 

系统长度

40 m - 75 m

 

安装年份

2014

情况

Shallow landslides were slipping into the lake and surrounding road.

描述

Landslide protection with shallow landslide barriers SL-150.

国家/地区

阿尔巴尼亚

客户

KESH Albania

工程

-

承包商

Cresta Geo Switzerland

分包商

-

防护对象

Road, Building

腐蚀保护

Galvanized

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址