瑞士
瑞士

myGeobrugg

泥石流和滑坡防护 - Favazzina 2015

Two filled barriers UX180-H6

泥石流和滑坡防护 - Favazzina 2015

The barrier was installed close to sensitive infrastructure; the A2 motorway viaduct in the background

泥石流和滑坡防护 - Favazzina 2015

UX-type barrier with support posts

泥石流和滑坡防护 - Favazzina 2015

VX barrier which is without posts

泥石流和滑坡防护 - Favazzina 2015

Just installed mudslide barrier

泥石流和滑坡防护 - Favazzina 2015

Because of the dry stone walls: a special UX barrier solution

泥石流和滑坡防护 - Favazzina 2015

Special meteorologic conditions lead to a massive landslide that was successfully held back by barriers

泥石流和滑坡防护 - Favazzina 2015

The barriers with extremely high load

泥石流和滑坡防护 - Favazzina 2015

According to the designer's data, the barriers must have the capacity to hold a pressure of at least 100 kilopascals / kN/m²

泥石流和滑坡防护 - Favazzina 2015

Bird's eye view: the landslide load is held back from the barrier

 
 

安装年份

2015

情况

The western side of Calabria, in southern Italy, is characterized by strongly altered orthogneiss outcrops, which give rise to fine and coarse sands. With heavy rainfalls, they are brought down to the valley and channeled into the famous "fiumare".

This phenomenon is particularly intense in the area of Favazzina, along the River Scirò. There it threatens the railway network, the national highway SS18, and the local road network.

描述

A series of Geobrugg barriers have been installed to limit the risk of debris flows . This deterrent system for debris flows was developed by Geobrugg with the Swiss research institute WSL in Birmensdorf, part of the Swiss Federal Institute of Technology Zurich (ETH), following the field trials in Illgraben, Switzerland. Also check Illgraben on YouTube.

The system consists of 19 barriers of various types: UX180, UX100 and VX100 of varying height from 4 to 6 meters, for a total of 970 square meters. All Geobrugg barriers are CE marked.

The week after the installation of the first barriers, a debris flow occurred. It was completely held back by the highest situated barrier, and thus saved and protected the downstream site. Subsequent events have filled the other barriers. After  inspection, it was decided not to proceed with emptying in order not to trigger further landslide movements. The retained debris flow material stabilizes the banks of the channel and thus reduces the formation of further debris flow. Inspections also revealed the excellent condition of the post-event structure: no intervention on the barriers was necessary.  Only some anchorages were slightly damaged. The braking system showed no deterioration.

国家/地区

意大利

客户

Regione Calabria

工程

Donatella Palma, Geoflum Engineering SrL

承包商

Idrogeo Srl, Cosenza

防护对象

Road, Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址