瑞士
瑞士

myGeobrugg

El Florido - Los Ranchos. Km 36.1

边坡稳定 - El Florido - Los Ranchos. Km 36.1 2019

Overview slope with TECCO® GREEN - fixing the spike plates

边坡稳定 - El Florido - Los Ranchos. Km 36.1 2019

Installation of stabilizing slope with anti-erosion mat

边坡稳定 - El Florido - Los Ranchos. Km 36.1 2019

Overview slope with TECCO® GREEN

 

安装年份

2019

情况

After a massive landslide had interrupted the traffic, the slope cut was terraced. However, its stability still was insufficient.

地質學

A layer of soil at the top and weathered rock at the bottom.

描述

The Consulter decided stabilize the slope using TECCO GREEN G65-3 system with nails of  nails L=12 m on bottom middle of slope (critical area).

客户

BCIE

承包商

Gabriel Couto

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

ACI

分包商

ICA Inversiones

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址