myGeobrugg
2025
The project is part of the 900 km Char Dham all-weather highway: It will enhance road connectivity to the four sacred shrines in the Uttarakhand Himalayas along the Char Dham Pilgrimage route.
In the past, during the monsoon season, heavy rains that caused dangerous landslides and rockfalls threatened pilgrims.
In order to mitigate the hazards due to such heavy rainfall, the Ministry of Road Transport and Highways have implemented mitigation measures for slope instability and rockfall protection.
印度
SAI GR IMPEX PVT.LTD.
Road
GEOBRUGG SUPERCOATING