瑞士
瑞士

myGeobrugg

Defereggental L25 - temporary barrier

道路护栏 - Defereggental L25 - temporary barrier 2020

A mobile road protection ahead of the Tunnel of Mellitz

道路护栏 - Defereggental L25 - temporary barrier 2020

Temporary protection against rockfall thanks to the combination of concrete and fence elements

 

系统长度

104 m

 

安装年份

2020

情况

The Austrian national road L25 in Tyrol (Defereggental) was completely closed after a massive rockfall at the portal of the Tunnel of Mellitz. The communities of St. Veit and St. Jakob entirely were cut off.

To re-connect the inhabitations with the "outer world," the road had to be quickly secured and cleared. A temporary solution, easy to install, and safe was required.

描述

Geobrugg supplied 26 mobile safety fence barriers (104 meters), each consisting of a NORDBETON concrete barrier and a Geobrugg debris fence panel.


This barrier system was originally designed and tested for race tracks. Due to its fast installation and high flexibility, it also meets the needs for temporary road protection against rockfall.

防护对象

Road

其他安装的应用程序

落石防护, 泥石流和滑坡防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址