瑞士
瑞士

Coal Mine

Highveld coalfields, 南非
2021
客户
n.a.
承包商
防护对象
Mine / Quarry
能级
100 kJ
系统的高度
2.0 m
系统长度
24 m - 132 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
矿井/隧道
情况

The mine has an impressive safety record and has won the group Chairman’s Safety Shield for its consistent improvement and the group CEO Safety Award for the best safety record of all group operations worldwide.
Required was a protection of the portal / entrance to the underground operation against rockfalls and masses of soil from erosion of the upper benches.

描述

It was decided to install GBE-100A-R rockfall barriers; height is 2 meters, total barrier length of the five barriers is 461 meters.

  • 1 GBE-100A-R, 77 m long
  • 2 GBE-100A-R, 108 m long
  • 3 GBE-100A-R, 24 m long
  • 4 GBE-100A-R, 120 m long
  • 5 GBE-100A-R, 132 m long 

本地联系方式

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
自然災害防護, Coastal Erosion Protection, 矿井/隧道
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / 瑞士
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
自然災害防護, 矿井/隧道
Geobrugg AG
Industriestrasse 21
5200 Brugg / 瑞士
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
自然災害防護, 矿井/隧道
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / 瑞士