美国
美国

Coal Mine

Highveld coalfields, 南非
2021
客户
n.a.
承包商
防护对象
Mine / Quarry
能级
100 kJ
系统的高度
2.0 m
系统长度
24 m - 132 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
矿井/隧道
情况

The mine has an impressive safety record and has won the group Chairman’s Safety Shield for its consistent improvement and the group CEO Safety Award for the best safety record of all group operations worldwide.
Required was a protection of the portal / entrance to the underground operation against rockfalls and masses of soil from erosion of the upper benches.

描述

It was decided to install GBE-100A-R rockfall barriers; height is 2 meters, total barrier length of the five barriers is 461 meters.

  • 1 GBE-100A-R, 77 m long
  • 2 GBE-100A-R, 108 m long
  • 3 GBE-100A-R, 24 m long
  • 4 GBE-100A-R, 120 m long
  • 5 GBE-100A-R, 132 m long 

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国