瑞士
瑞士

myGeobrugg

落石防护 - Campomanes-Lena 2019

The León-Gijón railway line in Asturias protected by a ring-net barrier

落石防护 - Campomanes-Lena 2019

Tunnel portal and rockfall barrier above

落石防护 - Campomanes-Lena 2019

The barrier easily adepts to the ground

 

系统

 

系统长度

160 m

 

安装年份

2019

情况

At the highly frequented León-Gijón railway line large blocks were a threat to the track and its users.

描述

A dynamic ring net barrier, an RXE-5000, 6 m high, was installed. This barrier is certified according to the new EAD 340059000106 and therefore has European Technical Evaluation and CE marking. Also, it is certified according to Swiss standards.

客户

ADIF (Administrador de Infraestructuras Ferroviarias)

承包商

Montaña Restauración Medioambiental, S.L.

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址