Autopista Cuernavaca-Acapulco

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Engaged Debris Flow Barrier as seen looking from the highway

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

The highway with pinpoints of the 8 barrier system locations

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Map of the two storms' trajectories

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Devastation at one of the installation locations (before)

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Destructive damage seen downstream of one of the overflowing debris channels

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Installation of one of the barriers

泥石流和滑坡防护 - Autopista Cuernavaca-Acapulco 2014

Engaged Debris Flow Barrier as seen looking toward the highway

 
 

系统长度

5 m - 25 m

 

安装年份

2014

情况

At the end of 2013 Hurricane "Ingrid" raced across Mexico from the Gulf. Within 24 hours Tropical Storm "Manuel" likewise raced across Mexico, but from the Pacific Ocean. The devastation resulted in multiple debris flows in known flood channels at three separate stretches of roadway along the Cuernavaca - Acapulco Highway. The flood channels overflowed and caused road closures; therefore, the Federal Department of Roads and
Bridges (CAPUFE) required innovative debris flow systems along 71.1 km of Autopista 95.

描述

This project is the first debris flow barrier system installation in Mexico. During the second half of 2014 and first half of 2015 Geobrugg designed, supplied and oversaw installation of multiple debris flow barriers (as part of 8 systems) ranging from 2.5 m to 10 m high with capacity of 100 to 120 kN/m2. These barriers prevent clogging of storm sewers at the base of the roadway embankments.

CAPUFE required barriers to protect vehicular traffic on this busy major highway after the
2013 devastation caused by the simultaneous occurrence of Hurricane Ingrid and Tropical Storm Manuel. These barriers will:

  • Retain a minor debris flow
  • Retain a large debris flow
  • Create a debris flow breaker
  • Prevent culvert blockages
  • Drain a collection of debris/rubble
  • Divert a channel to correct its course
  • Protect against scour and erosion
  • Protect channel banks from erosion

国家/地区

墨西哥

客户

Federal Department of Roads and Bridges (CAPUFE)

工程

ACRE SA de CV

承包商

ACRE SA de CV

防护对象

Road

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址