Alto Maipo Surface

Maitenes - San Jose de Maipo, Alto Maipo, 智利
2016
客户
Proyecto hidroelectrico Alto Maipo
工程
Geotest
承包商
Incolur
防护对象
Building, Mine / Quarry, Infrastructure
能级
1000 kJ
系统的高度
5.0 m
系统长度
120 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
矿井/隧道
情况

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

描述

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国