스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Paseo San Nicolás 2018

The slope with TECCO® G65/3

비탈면 보강 시스템 - Paseo San Nicolás 2018

Staking out the drilling points

 
 

Year of installation

2018

Situation

In the residential area of San Nicolas, superficial problems of instability occurred in 2017. The real estate developer of the project asked for a solution to protect the back yards of some houses, which were already inhabited.

Geology

Lime soil layer.

Description

A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.

Customer

Portales de Nuevo Emperador S.A.

Contractor

NDC

Protected object

Residential area

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Eng. José Harris

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail