미국
미국

myGeobrugg

Olt Valley, km 198+000 - 226+000

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

Two lines of the 6 m high rockfall barrier type RXI-200 and the protected road DN7

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

During final installation works at the 5 m high RXI-200 rockfall barrier

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

Geobrugg RXI systems offer fast and simple installation what is highly appreciated by contractors

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The 6 m high rockfall barrier type RXI-200 during installation without traffic interruption

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The 6 m high rockfall barrier type RXI-200 after installation

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The same, 120 m long RXI-200 rockfall barrier one year after installation - perfectly integrated in the nature

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

RXI-200 rockfall barrier anchored directly in the rock face - special solution without border post

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The 5 m high rockfall barrier type RXI-100 from another side of the Olt River

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

This RXI-100 rockfall barrier is also a protection against debris flow

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The RXI-200 rockfall barrier which was tested on site

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

RXI-200 rockfall barrier direct rock connection and TECCO® SYSTEM³ stabilization

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The same, on site tested, RXI-200 rockfall barrier and TECCO® SYSTEM³ as mix of passive and active solutions

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

The same, on site tested, RXI-200 rockfall barrier and TECCO® SYSTEM³ one year after installation visible from the other side of the Olt River

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

5 m high RXI-100 rockfall barrier with rockface connection and SPIDER® S4-230 high tensile net fixing the big rock blocks on the slope

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

Another area with RXI-200 rockfall barrier and TECCO® SYSTEM³ as mix of passive and active solutions

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

Again RXI-200 rockfall barrier and TECCO® SYSTEM³ - here the barrier protects also against debris flow

낙석방호시스템 - Olt Valley, km 198+000 - 226+000 2009

View of the situation through the high tensile ROCCO® ringnet

 

System length

25 m - 120 m

 

Year of installation

2009

Situation

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

 

Description

As passive protection measures, AXI and RXI rockfall barriers with dynamic capacity ranging from 500 to 3000 kJ were chosen for the following sectors:

1. km 198+523.72 - 198+571.00
RXI-050

  • capacity: 500 kJ
  • length: 20 m
  • height: 2.5 m

2. km 200+166 - 200+193
RXI-200

  • capacity: 2.000 kJ
  • length: 30 m
  • height: 6 m

3. km 200+207 - 200+219
RXI-200

  • capacity: 2.000 kJ
  • length: 30 m
  • height: 6 m

4. km 201+384 - 200+427
RXI-300

  • capacity: 3.000 kJ
  • length: 50 m
  • height: 6 m

5. km 206+004 - 206+034
RXI-100 and RXI-300

  • capacity: 1000 and 3000 kJ
  • length: 25 m and 30 m
  • height 5 m and 6 m

See also the other projects of the Olt Valley.

Customer

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

Contractor

Sächsische Bau GmbH Dresden Germany, Sibiu Branch

Protected object

Road, Railway

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

Institut de Proiectări pentru Transporturi Auto, Navale și Aeriene (I.P.T.A.N.A.) București

Subcontractor

AlpConstruct – Vâlcea

Other installed applications

비탈면 보강 시스템, 토석류 및 산사태 방호 시스템

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail