İsviçre
İsviçre

myGeobrugg

Şev ve Yamaç koruma - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

Şev ve Yamaç koruma - Zion Hill 2015

Installed TECCO® SYSTEM3.

Şev ve Yamaç koruma - Zion Hill 2015

TECCO® G65/3 rolls during installation.

Şev ve Yamaç koruma - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 

Sistemler

 

Kurulum Yılı

2015

Durum

Rockfall from the channel wings meant risk for the channel workers.

Açıklama

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

Müşteri

Autoridad del Canal de Panamá - ACP

Yüklenici

Alvarado & Düring International

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Autoridad del Canal de Panamá - ACP

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta