Yellowstone

Yellowstone National Park, Amerika Birleşik Devletleri
2022
Gösterilen obje
Road, Touristic infrastructure, Infrastructure
Korozyon koruması
GEOBRUGG SUPERCOATING
Dengelenen alan
2700 m²
Erozyon kontrol matı
Evet
Konumlandırma
-
Durum

In June 2022, Yellowstone National Park experienced historic flooding – damaging roads, water and wastewater systems, electrical infrastructure and other critical park infrastructure. To help with the reconstruction of the damaged roadways, GeoStabilization International was awarded two emergency design-build contracts for slope stabilization.
 

Açıklama

The first works were done on the Old Gardiner Road Bypass at Mammoth Hot Springs, where damage at the Park’s North Entrance, cut off access to Gardiner, Montana. Approximately 20,000 square feet (1860 m2) of pinned mesh stabilized the slope, using our TECCO Green G65/3 to help promote revegetation.
 
The second included a buildout of approximately 120 linear feet (35 m) of the roadway at the East Entrance Gates adjacent to Middle Creek where flooding caused erosion of the bank and placed US Highway 14 in Wyoming at risk.

 

The pictures were provided by GeoStabilization International.

Yerel yetkiliniz

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Mining / Tunnels
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / İsviçre
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Mining / Tunnels
Geobrugg AG
Industriestrasse 21
5200 Brugg / İsviçre
Alexander Bittendorfer
Alexander Bittendorfer
Global Project Manager Services
Natural Hazards
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / İsviçre
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Mining / Tunnels
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / İsviçre