Şev ve Yamaç koruma - Túneles de Artxanda 2019

Mesh roll-out for an easy installation process

Şev ve Yamaç koruma - Túneles de Artxanda 2019

Covering the steep slope with stabilizing mesh

Şev ve Yamaç koruma - Túneles de Artxanda 2019

The mesh is lightweight and after installation, barely visible

 

Sistemler

 

Kurulum Yılı

2019

Durum

The Artxanda Tunnels connect the Txorierri Highway Corridor with Bilbao. In the vicinity of the tunnel entrance, several massive rocks broke. Rocks have fallen onto the roadway, thus endangering traffic. For this reason, Interbiak decided to stabilize this area.

Açıklama

To stabilize the slopes, anchored concrete bars, and a flexible stabilization system were installed. The DELTAX® 80/3 mesh was anchored to the ground with bolts 25 mm in diameter and 6 m long, in a 3Vx4H m² grid.

Müşteri

Interbiak, Diputación Foral de Vizcaya

Yüklenici

New Construction, S.L.

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta