Gösterilen obje
Touristic infrastructure, Architecture
Korozyon koruması
GEOBRUGG SUPERCOATING
Dengelenen alan
210 m²
Maksimum eğim yüksekliği
14 m
Konumlandırma
North
Durum

At the historical Slunj fortress, blocks of the limestone base collapsed. The ruins of Slunj were in danger.

Jeoloji

Limestone

Açıklama

The city of Slunj, the Croatian Government, and an EU fond were invested in rehabilitating the old fortress. It was stabilized with a concrete beam with nails then covered with a stone wall. Our part is the stabilization of the base of the fortress and the protection of people walking nearby. In a first step Spider S3-130 mesh with nails (32 mm, length 4 m) was installed. The protection of other areas of the slope with TECCO mesh G65/3 is planned.

Yerel yetkiliniz

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Amerika Birleşik Devletleri
Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Amerika Birleşik Devletleri
John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Amerika Birleşik Devletleri
Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Amerika Birleşik Devletleri
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
Salem OR 97302 / Amerika Birleşik Devletleri