Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

Most demanding system test: A few weeks after installation, a debris flow hit the barrier. A sound design, combined with excellent installation works, stopped the debris and prevented the damage.

Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

Stakeout of the ring net barrier layout: Critical step prior to drilling works to ensure the best performance of the system

Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

Drilling of the lateral spiral wire rope anchors: Different drilling rigs can be used, depending on the prevailing geology, location, and available machines

Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

Depending on the length of the lateral spiral wire rope anchors, different tools are used

Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

As an alternative to stabilizing mesh, a lateral shotcrete layer prevents erosion. The flexible riverbed (V)X barrier was installed within only a couple of days. Great work by Gulf Rock Engineering!

Moloz akışına ve heyelana karşı koruma - Shis - Khor Fakkan road 2019

Rockfall barrier GBE-1000A protecting a tunnel portal at Shis - Khor Fakkan road

 
 

Sistem uzunluğu

6 m - 15 m

 

Kurulum Yılı

2019

Durum

The scenic new mountain highway westwards from Khor Fakkan is crossing several Wadis (valleys). Despite the rather arid climate, heavy annual rainfalls are likely to cause debris flows and land- or mudslides along the Wadis.

A solution was necessary to prevent debris flows from blocking the drainage culverts and, even worse, overflow the newly constructed highway.

 

Açıklama

Two 6 meters high VX flexible debris flow barriers

The debris flow barriers were designed using the DEBFLOW online tool in close collaboration with the clients engineering team. The expected impact loads (kN/m²) were calculated based on geology, topography, and other decisive boundary conditions.

In Mai 2019, one of the flexible debris flow barriers underwent the most severe proof: Heavy rainfall triggered several debris flows along the various Wadi's. One of them hit the recently completed barrier which remained undamaged. After an excavator had removed the debris material, the barrier was ready again for the next thunderstorms.

Müşteri

Gulf Rock Engineering

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Kurulan diğer uygulamalar

Kaya düşmesine karşı koruma

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta