İsviçre
İsviçre

myGeobrugg

Kaya düşmesine karşı koruma - Piwniczna Zdrój DK87 2016

GBE-500-A rockfall barrier along the state road DK87 Piwniczna Zdrój

Kaya düşmesine karşı koruma - Piwniczna Zdrój DK87 2016

Loose rock above the road

Kaya düşmesine karşı koruma - Piwniczna Zdrój DK87 2016

Over 350 meters of road protected by rockfall barriers

 

Sistem uzunluğu

108 m - 252 m

 

Kurulum Yılı

2016

Durum

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

Açıklama

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

Müşteri

GDDKiA Oddział Kraków

Yüklenici

BMD Sp. z o.o.

Korozyon koruması

Galvanized

Mühendislik

BMD Sp. z o.o.

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta