İsviçre
İsviçre

myGeobrugg

Orang Kalaktang Shergaon Rupa Tenga Road

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

Stabilized slope six months after installation with natural greening

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

During installation

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

Rolling out TECCO GREEN stabilizing mesh with erosion control mat

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

The mesh with the anti-erosion mat adapts to the uneven ground

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

Top of the stabilized slope six months after installation of the mesh

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

The stabilized mountain flank is completely re-vegetated

Şev ve Yamaç koruma - Orang Kalaktang Shergaon Rupa Tenga Road 2020

Safe road with stabilizing mesh underneath

 

Kurulum Yılı

2020

Durum

The OKSRT Road in the north east of India near the Chinese border is of strategic importance. Because of erosion underneath the road it had become instable which prompted the Indian government to tender stabilization measures.

Jeoloji

Granitic gneiss, sandstone, and highly jointed and fractured quartzite
The area experiences relatively high rates of weathering due to complex and harsh climatic conditions, heavy rainfall, variable topography, and a complex drainage network. Also, physicochemical weathering favors the formation of the soil. The geotechnical behavior of the mountain soil is a function of parent rocks, topography, rainfall, and weathering. In this area, the soil is dominantly composed of stony particles derived from the parent rocks. These stony particles are rich in quartz since the rate of chemical weathering of quartz and mica is relatively slow compared to that of feldspar.

Açıklama

The customer opted for a solution that combines high-tensile steel wire mesh and an erosion control mat. It protects against surface erosion and supports vegetation growth. The stabilization works started in 2019, respecting the monsoon season from July to September. The installation was completed in 2020 and made the road safe again.

More details of the installed solution:

  • Spike plates P33 with a grid pattern 2.0 x 2.0 m
  • Self drilling anchors, steel R32 of 6 meters length

Müşteri

BRO Vartak, Government of India

Yüklenici

Pioneer Foundation Engineers Pvt. Ltd.

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta