İsviçre
İsviçre

myGeobrugg

Obre Biel, Matterhorn Gotthard Bahn

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier protecting Matterhorn Gotthard Railway line against rockfalls, snow slides and smaller avalanches

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Finite elements based simulation software FARO allowed the correct barrier dimensioning according to the customer requirements

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling works using walking excavator equipped with drill rig

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling with casing was necessary due to poor ground conditions and thus unstable drill holes

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier during installation - visible already positioned posts with retaining and lateral ropes

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

ROCCO® ring net installation using shackles

Kaya düşmesine karşı koruma - Obre Biel, Matterhorn Gotthard Bahn 2016

Fully installed Multi Hazard Barrier with special gap filling adjustment

 

Sistem uzunluğu

28 m - 112 m

 

Kurulum Yılı

2016

Durum

The railway line Matterhorn Gotthard has a section called Obre-Biel that is being used by as many as  ten passanger trains per hour, along with cargo trains. Over the years, this section of the railway has been inundated by snow slides and smaller avalanches. Consequently, railway traffic has been severly impaired and has also created the danger of possible trail derailment. The line was also endangered by rockfalls.

 

 

Açıklama

The soution shall protect the railway line against snow slides, snow avalanches and rockfalls. Choosing flexible rockfall barriers willl decrease the amount of traffic disturbances.

Standard rockfall barriers are designed to deal with loads caused by rockfalls. So, to serve as a mutli-hazard protection system, some special dimensioning has to be implemented.

Such special dimensioning is not possible without involving computer simulations. For this purpose, Geobrugg uses finite element simulation software called FARO. FARO was originally developed by the Swiss Federal Institute for Forest, Snow and Landscape Research, and WSL, in order to simulate rockfall barriers with ring nets.

Further software development financed by the Commision for Technology and Innovation CTI allowes surface load simulations caused by debris flows, shallow landslides and avalanches.

By using FARO software, a total of 182 meters of rockfall barriers were correctly dimensioned to protect the railway line. They were finally divided into three lines of 112, 42 and 28 meters.

Müşteri

Matterhorn Gotthard Bahn (MGB)

Yüklenici

ABA Bautec AG

Gösterilen obje

Railway

Korozyon koruması

Galvanized, GEOBRUGG SUPERCOATING

Mühendislik

geoformer igp AG (wasser/schnee/lawinen - André Burkard AG)

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta