Natural Gas Pipeline Project Central Tennessee

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

Completed slope stabilization, revegetating and eco-friendly - with deer traversing the slope

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

Clearing the slope. Photo thanks to courtesy of Geofirma, LLC

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

Excavating the trench for the pipeline. Photo thanks to courtesy of Geofirma, LLC

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

Drilling and installation of high tensile steel TECCO® SYSTEM³ after the pipeline was covered. Photo thanks to courtesy of Geofirma, LLC

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

Lightweight modular drilling machine used for top-down installation of soil nails. Photo thanks to courtesy of Geofirma, LLC

Şev ve Yamaç koruma - Natural Gas Pipeline Project Central Tennessee 2014

TECCO® SYSTEM³ during installation - visible dells around the nails for system pretensioning

 

Kurulum Yılı

2014

Durum

Natural Gas pipeline installed involving clearing of slopes and covering a 20 in transmission line. The two slopes detailed on this project needed stabilizing to protect the integrity of the transmission line, personal property and the public from a slope failure. The solution required a cost effective system that could meet site challenges and provide safe, eco friendly slopes.

The nailed (anchored) TECCO® System effectively stabilized the slopes protecting the integrity of the natural gas pipeline, property and the public. The revegetated slope looks great and is eco-friendly. Grooming of the slope is not a problem and animals can easily traverse the mitigated area.

Jeoloji

Residual soil/coluvium

Açıklama

The solution was 82 000 ft² of anchored TECCO® System utilizing TECCO® G65/3 and P33/40 spike plates. Challenges for design and implementation included access to the top of the slope. This was accomplished using a light weight, modular wagon drill for the top down TECCO® installation. The pipeline had to be considered during design with anchors strategically placed around the pipeline. Cathodic protection was ensured with properly grouted anchors and installing sleeves through the TECCO® mesh for wiring.  

Müşteri

Energy Company

Yüklenici

General Contractor: Sheehan Pipe Line Construction Co.

Gösterilen obje

Road, Residential area, Infrastructure, Other

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Civil: Fisher & Arnold Inc. / Geotechnical: TTL Inc. / Design & Build Slope Stabilization Engineer: Teasley Services Group LLC

Alt yüklenici

Geotechnical Stabilization Contractor: Geofirma LLC

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta