İsviçre
İsviçre

myGeobrugg

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

Impact - the barrier does its job and holds back the falling rocks

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

Situation in 2016 before the installation of the barriers: boulders were coming down frequently and hitting the road.

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

The RXE-500-LA barrier with secondary mesh after installation

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

Protected road and residential area

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

The barriers are 60 and 96 meters long, both 3 meters high

Kaya düşmesine karşı koruma - Kroscienko-Klodno 2018

Another rockfall incident (winter 2019)

 

Sistem uzunluğu

60 m - 96 m

 

Kurulum Yılı

2018

Durum

Regular rockfall menaced the village of Kroscienko. Boulders were falling on an access road adjacent to backyards and homes.

Açıklama

In 2017, the Regional Directorate of State Forests in Krakow decided to secure the endangered area. As the stretch was rather long, they were convinced of the RXE-500-LA barriers with low anchoring forces and quick installation.

Müşteri

Soley sp.z o.o.

Yüklenici

Soley Sp. z o.o.

Gösterilen obje

Road, Residential area

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Soley Sp. z o.o.

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta