Amerika Birleşik Devletleri
Amerika Birleşik Devletleri

JiJi Tour Line

Nantou County, Tayvan
2020
Mühendislik
United Geotech, INC.
Yüklenici
Jin Xin Engineering Co., Ltd.
Gösterilen obje
Railway
Korozyon koruması
GEOBRUGG SUPERCOATING
Dengelenen alan
250 m²
Maksimum eğim yüksekliği
10 m
Eğim meyili
70 ° - 80 °
Konumlandırma
North
Durum

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

Açıklama

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

Yerel yetkiliniz

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Amerika Birleşik Devletleri
Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Amerika Birleşik Devletleri
John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Amerika Birleşik Devletleri
Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Amerika Birleşik Devletleri
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
Salem OR 97302 / Amerika Birleşik Devletleri