Dil
Türkçetr
Amerika Birleşik Devletleri
myGeobrugg

Kayıt

Kişisel giriş bilgileriniz var mı?

Kayıtlı bir myGeobrugg kullanıcısı olarak indirilebilir dokümanların ve sunduğumuz boyutlandırma programlarına yönelik erişim imkanınızı genişlettiniz.

Kayıt ol
A company of the BRUGG Group
Amerika Birleşik Devletleri
Huepach, Canton of Berne 2013 - Geobrugg Huepach, Canton of Berne 2013 - Geobrugg
Huepach, Canton of Berne 2013 - Geobrugg Huepach, Canton of Berne 2013 - Geobrugg
Huepach, Canton of Berne 2013 - Geobrugg Huepach, Canton of Berne 2013 - Geobrugg

Huepach, Canton of Berne

   Paylaş
Cadde
Huswald
Posta Kodu
3765
Yer
Oberwil, Simmental
Ülke / Bölge
İsviçre
Kurulum Yılı
2013
Müşteri
Community of Oberwil, dept for flood control
Mühendislik
Emch & Berger, Berne
Gösterilen obje
Road, Railway, Building, Residential area
Sistemler
Özel çözümler
Sistem boyu
6.0 m, 14.0 m
Sistem uzunluğu
10 m - 40 m
Korozyon koruması
GEOBRUGG SUPERCOATING®
Bariyer sayısı
2
Tutma kapasitesi
> 1000 m³
Durum

As a result of three heavy thunderstorms during the nineties, the mountain creek Hüpach caused shallow landslides, debris flows, and deluges. Debris and boulders blocked roads and railways in Oberwil near Interlaken. To prevent future hazards, our customer Schwellenkorporation Oberwil decided to install two retention structures. The construction is designed for a 300-year debris flow event. This project was a joint endeavor of the sister companies Geobrugg and Fatzer.

Benefits of the chosen solution:

  • Minimal material requirement – an important factor because of limited site accessability
  • Low total costs
  • Minimized impact to nature
  • Highest possible drainage permeability
  • Full functionality of the entire system

Açıklama

The barrier was planned and installed to protect settled areas within the community, highly endangered by debris flow and flooding. The goal for the client (and therewith for GEOBRUGG and the planner) was to find a cost effective solution to saveguard lives, buildings and property.

Key figures of the drainage basin:

  • Retention capacity: 16´000 m³
  • Average slope inclination in the flow channel: 32 %
  • Length of the main channel: 4150 m
  • The peak discharge for a return period of 300 years is 350 m³/s. Debris flow modelling was calculated using the software RAMMS from SLF / WSL (Switzerland).

This solution is also documented in a video

Yerel yetkiliniz

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Telefon +1 860 377 3230

İletişim formu

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
Telefon +1 909 706 8964

İletişim formu

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Telefon +1 505 220 1404

İletişim formu

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Telefon +1 336 337 0945

İletişim formu

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Telefon +1 505 771 4080
Mobil +1 505 400 0796

İletişim formu

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / USA
Telefon +1 503 423 7258

İletişim formu