Gföller Brücke, Val d’Ega

Val d’Ega, İtalya
2014
Müşteri
Provinz Bozen
Mühendislik
PPS Group, Bozen
Yüklenici
Max Bögl
Gösterilen obje
Road
Enerji emme kapasitesi
2000 kJ
Sistem boyu
1.0 m, 1.5 m, 2.0 m
Sistem uzunluğu
20 m - 40 m
Korozyon koruması
GEOBRUGG SUPERCOATING
Durum

The gallery between two stretches of tunnels is exposed to rockfall. The concrete deck risked to be damaged by severe events.

Açıklama

To secure the bridge from rockfall energies up to 2300 kJ, a gallery roof construction was built above the street-stretch between the two tunnels. To reduce the risk further, the gallery-roof was secured by the ROCKFALL-X G damping system. A protection system which works by absorbing kinetic energy, thereby limiting deformation and above all limiting the pressure exerted on the deck by spreading loads over a wide area, while limiting the weight on the gallery so as not to overburden it.

556 preassembled ROCKFALL-X G big bags were delivered and installed during May and June 2014 in the following configuration:

  • 109 pcs. - 1.0 m high
  • 99 pcs. - 1.5 m high
  • 348 pcs - 2.0 m high

Yerel yetkiliniz

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Mining / Tunnels
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / İsviçre
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Mining / Tunnels
Geobrugg AG
Industriestrasse 21
5200 Brugg / İsviçre
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Mining / Tunnels
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / İsviçre