Moloz akışına ve heyelana karşı koruma - Gaviota Pass 2004

Ringnet barrier at work

Moloz akışına ve heyelana karşı koruma - Gaviota Pass 2004

Debris flow barrier

Moloz akışına ve heyelana karşı koruma - Gaviota Pass 2004

Ringnet barrier protecting th culvert

 

Sistemler

 

Sistem uzunluğu

13 m

 

Kurulum Yılı

2004

Durum

This drain was regularly blocked by alluvial material.

Açıklama

Installation of a ring net barrier directly in front of the culverts that retains solid material and allows watery, fine material to flow through. The material was retained in the course of three debris flow events without impairing the through traffic. Following excavation the barriers were again fully functional.

Müşteri

-

Gösterilen obje

Road

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta