Installed SPIDER® Avalanche barrier - part of the largest snow net barriers project in North and South America. Photo Courtesy of West Coast Scalers.

Çığ önleme - Cougar Corner 2016

Overview of the installation site before works execution. Visible Trans-Canada Highway below.

Çığ önleme - Cougar Corner 2016

Construction required very demanding rope access. Our specialists were consulting the whole project constantly - here during stake-out.

Çığ önleme - Cougar Corner 2016

Another example showing demanding conditions!

Çığ önleme - Cougar Corner 2016

Light weight drilling equipment suspended on ropes was the only reasonable choice to get the job done.

Çığ önleme - Cougar Corner 2016

Drilling of anchors and micro piles in steep and complicated terrain of Cougar Corner 7.

Çığ önleme - Cougar Corner 2016

Perfect example of strong work commitment! Photo Courtesy of West Coast Scalers.

Çığ önleme - Cougar Corner 2016

Thanks to lightweight components, helicopter transportation was very efficient. In fact that was the only possible way of bringing material to construction site.

Çığ önleme - Cougar Corner 2016

Special debris flow barriers with snow retaining capacity were installed amongst SPIDER® Avalanche barriers in a very demanding geomorphologic conditions. Perfect terrain adjustability is visible.

Çığ önleme - Cougar Corner 2016

Proud installation crew – finishing touches at the top of Cougar Corner 7.

Çığ önleme - Cougar Corner 2016

Overview of the installed SPIDER® Avalanche barrier.

Çığ önleme - Cougar Corner 2016

Trans-Canada Highway directly below the SPIDER® Avalanche.

Çığ önleme - Cougar Corner 2016

Cougar Corner - the largest snow net barriers project in North and South America (over 2000 m SPIDER® Avalanche and three 20 m wide UX debris flow barriers). Cougar Corner 8 shown here (approx. 25 % of the entire project).

 

Sistem uzunluğu

6 m - 91 m

 

Kurulum Yılı

2016

Durum

The Trans-Canada highway travels through the Glacier National Park and over Rogers Pass which is well known for numerous avalanches each year.

Since the late 1950’s avalanche control was conducted by Parks Canada Agency and the Canadian Armed Forces by shelling slide areas with howitzers. While this mitigation system functioned, there was still the issue of blocking the Trans-Canada by man-made slides. Remote Avalanche Control Systems (RACS) were also considered, however there was still a potential of blocking the highway with snow slides. To keep the highway clear all winter long it was decided to hold the snow in place with snow nets.

In December 2015, Parks Canada Agency invited contractors to bid on installing approximately 2000 meters of Dk 3.5 and Dk 4.5 snow nets. Avalanches in Glacier National Park slide directly on to the Trans-Canada Highway which runs right through the park. Closed highways cost Canada millions of dollars every year if blocked due to snow and rock slides.


Açıklama

Three slide paths were to be secured. They are called Cougar Corner No. 6, 7, and 8. Each slide area has its own challenges.

Alpine Solutions determined the net locations and net sizes as well as prescribing three Geobrugg UX Debris Flow Barriers in channels too incised to accommodate traditional snow nets.

Bidding was a challenge for contractors as the site was covered with 4 meters of snow in December. BAT Construction Ltd. was the successful bidder, and chose Geobrugg SPIDER® Avalanche. The contractor was able to install over 1000 meters of nets and drill anchors for 2000 meters of nets all in the summer of 2016. No small feat at this location!

To date this is the largest snow net project in North and South America: 1000 meters done so far, 1000 meters more to go. First debris flow barrier installed entirely by helicopters in North America.

Müşteri

Parks Canada Agency

Yüklenici

BAT Construction Ltd.

Gösterilen obje

Road

Korozyon koruması

Galvanized, GEOBRUGG SUPERCOATING

Mühendislik

Alpine Solutions Avalanche Services - Brian Gould

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta