낙석방호시스템 - Navachab Mine 2002

General overview of the rock face within the mine

낙석방호시스템 - Navachab Mine 2002

The muck pile after the failure.; material from the oxidized soft lower schist

낙석방호시스템 - Navachab Mine 2002

Boulders retained by the net

낙석방호시스템 - Navachab Mine 2002

Material held back by the rockfall barrier

 

System length

150 m

 

Year of installation

2002

Situation

In 2003 a 100 m³ fall of ground (FOG) occurred at Navachab Gold Mine, originated in the oxidized schist from an older failure scar. The FOG material was held back on the 1050 m catch bench. The elastic catch fence that was installed on the catch bench prevented overspill of the material into the pit. The risk to life though was very low as the pit bottom was closed to mining operations at the time.

Description

The failure, though small, was monitored by the early warning system. It was fortuitous that the failure occurred near one of the early warning systems extensometers and progression of the failure was recorded using this extensometer. The last geotechnical report to management stated that collapse of this material was imminent. The FOG activated the early warning system, and the pit was successfully evacuated, and all personnel congratulated on their prompt reaction to the early warning system. No injuries or equipment damage occurred during this FOG.

Customer

Anglo Gold

Contractor

Nautical Steel/Navachab Mine

Protected object

Mine / Quarry, Other

Engineering

SRK Consulting Engineers

Other installed applications

터널, 광산

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail