Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

Rockfall canopy for 2000 kJ with self cleaning effect, protecting Tunnel des Pontis portal area

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

Overview of the situation before installation - visible slope with rockfalls up to 2000 kJ of dynamic energy, endangering cantonal road below

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

Designing this unique rockfall canopy, Geobrugg specialists used also simulation software FARO, allowing the structure not only to be 100 percent safe but also have certain self cleaning effect

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

Portal area before canopy installation

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

Rockfall canopy installation required temporary road closure and involved rope access works. Total installation time of two months is short compared to other solutions like concrete gallery

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

The working gallery shows the rockfall threat, not only from big boulders but also from huge amounts of smaller rocks

Камнепады, обвалы, осыпи - Tunnel des Pontis 2010

The installed canopy protects the road.

 

Системы

 

Длина системы

- 61 m

 

Год установки

2010

Ситуация

The entrance of the historic Tunnel des Pontis was endangered by rockfalls.

Описание

The flexible rockfall canopy – at present the world’s strongest, with an energy absorption capacity of 2000 kJ – was installed at an approximately 60 m long rockface at the Tunnel des Pontis. The supporting structure calculations including special load cases such as boundary field hits, suspension rope hits and snow load were fully simulated on a computer using the FARO software. A total netting coverage of 1200 m² was installed. Lengthening the existing tunnel would have cost eight times more than Geobrugg’s solution.

Клиент

Association intercommunale d’Anniviers

Подрядчик

Sébastien Chéseaux Paravalanches SA

Защищаемый объект

Дорога

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Nivalp SA / Geobrugg AG

Представитель в Вашем регионе

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / США Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Central US

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / США Regional Manager Central US

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / США Regional Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Sales Director

Инженерная защита
Geobrugg North America, LLC,Salem OR 97302 / США Sales Director

Электронная почта