The Geobrugg GUARD on a barrier on the island of Sørøya north of the arctic polar circle.

Мониторинг опасных процессов - Sørøya II 2020

Sørøya is hard to access: Journeys for controls inspections or maintenance are time consuming and expensive.

Мониторинг опасных процессов - Sørøya II 2020

In the first phase, three monitoring devices were placed in different locations within the field. This site is affected by rockfall, snow loads and also a high corrosion rate.

Мониторинг опасных процессов - Sørøya II 2020

The installation of the monitoring device requires no special knowledge. Only two nuts must be tightened.

 

Системы

 

Год установки

2020

Ситуация

On the north Norwegian island Sørøya, above the main road from Hasvik to Sørvær, SPIDER Avalanche® Barriers were installed in 2019 to protect this remote - and touristic - road from rockfall and avalanches.

The island of Sørøya is situated north of Tromsø, north of the arctic polar circle. Though touristic in summer, it takes many hours to get there. The barriers of high-tensile steel are not only exposed to rockfall in summer and avalanches in winter, they are also close to the sea. This means corrosion is a permanent threat.

The Norwegian authorities requested a solution to monitor and report impacts or slow filling of the barriers. They also are interested in knowing about any corrosive effects the nearby Barents Sea is having on the barriers - not an average calculation, but reality time measurements at on these barriers.

Описание

In the first phase, three GUARD monitoring devices were placed in different locations within the barrier field. An early finding was that corrosion is significantly higher at the barriers close to the sea than those further up the slope. These, are more frequently and more severely affected by rockfall, for example the barrier shown on the top-left edge of the picture below where one of the GUARDs is on duty.

Today authorities can use data to decide when measures at the barriers are to be taken. In this way inspection trips can be reduced and maintenance works can be bundled. More importantly, safety increases as the situation can be assessed and acted upon when a report is received. 

Подрядчик

Защищаемый объект

Дорога, Туристическая инфраструктура, Инфраструктура

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария

Электронная почта