Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg
Scout Road in Mytholmroyd 2016 - Geobrugg Scout Road in Mytholmroyd 2016 - Geobrugg

Scout Road in Mytholmroyd

   
Улица
Scout Road
Мест
Mytholmroyd
Страна / Регион
Великобритания
Год установки
2016
Клиент
Calderdale Council
Проектировщик
JBA Consulting Ltd.
Подрядчик
DHRA Geotechnical Ltd.
Защищаемый объект
Дорога
Системы
SL-150
Высота системы
3.5м
Длина системы
232 m - 232 m
Защита от коррозии
Оцинковка, GEOBRUGG SUPERCOATING®
Количество барьеров
1
Удерживающая способность
350 m³
Ситуация

During heavy storms over the Christmas holiday period 2015 a section of slope failed and slid onto Scout Road.  The road is a key access point to a local school which it was important to open as soon as possible.  Geobrugg were called to site to advise on possible solutions to protect the road so the school could be reopened.  After examining the site Geobrugg recommended SL-150 landslide barrier be placed underneath the affected area.

Following further inspection works pre-construction tension cracks were noted at the top of the slope covering approximatly 175 [m] of the slope, the section that failed was only aproximately 40 [in] width.  So it was decided the barrier should cover the entire length to mitigate against further possible landslides.

Описание

The client's preferred contractor mobilised to site to start site clearance ahead of installing the barrier during site clearance it was noted that the failed section of slope was an old landfill area containing asbestos and not natural soils. 

With the assistance of Geobrugg engineers the fence line was set out at a length of 232 [m] with a post separation of 6 [m]. To accommodate local topography some post spacings were adjusted and an upslope direction change was marked out. 

Geobrugg engineers were on hand throughout the construction phase to assist with the installation as the contractor had never built a barrier before. The project was completed fall 2016 and the client is happy with the barrier which is the first they have had installed.

Представитель в Вашем регионе

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Инженерная защита
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / США
Телефон +1 860 377 3230

Форма обратной связи

Saleh Feidi
Saleh Feidi
Regional Manager California
Инженерная защита
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / США
Телефон +1 909 706 8964

Форма обратной связи

John Kalejta
John Kalejta
Regional Manager Central US
Инженерная защита
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / США
Телефон +1 505 220 1404

Форма обратной связи

Bob Lyne
Bob Lyne
Regional Manager Southeast
Инженерная защита
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / США
Телефон +1 336 337 0945

Форма обратной связи

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Инженерная защита
Geobrugg North America, LLC
22 Centro Algodones
Телефон +1 505 771 4080
Мобильный +1 505 400 0796

Форма обратной связи

Tim Shevlin
Tim Shevlin
Sales Director
Инженерная защита
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / США
Телефон +1 503 423 7258

Форма обратной связи