Швейцария
Швейцария

myGeobrugg

Селевые потоки и микросели - Königstein, Saxony 2012

The installed UX060L-H4 barrier from the top - below the protected railway and the road

Селевые потоки и микросели - Königstein, Saxony 2012

Geology of the construction site - visible material which could be potentially triggered and form a debris flow

Селевые потоки и микросели - Königstein, Saxony 2012

Overview of the torrents endangering the infrastructure below

Селевые потоки и микросели - Königstein, Saxony 2012

For the transport of construction material a temporary, inclined elevator platform was installed

Селевые потоки и микросели - Königstein, Saxony 2012

Anchor drilling was executed from the temporary platform

Селевые потоки и микросели - Königstein, Saxony 2012

UX060L-H4 debris flow barrier's post already connected with the ground plate - with a very elegant fundament

Селевые потоки и микросели - Königstein, Saxony 2012

Barrier anchor drilling was executed using mobile drilling devices

Селевые потоки и микросели - Königstein, Saxony 2012

Detailed view of Geobrugg's wire rope anchors: anchor head with double corrosion protection, ensuring long lasting and maintenance free usage

Селевые потоки и микросели - Königstein, Saxony 2012

Closer look on the UX060L-H4 debris flow barrier after installation was finished in May, 2012

Селевые потоки и микросели - Königstein, Saxony 2012

The UX060L-H4 debris flow barrier from below - thanks to its lightweight structure, all installation works could be executed by hand

 

Системы

 

Длина системы

7 m - 25 m

 

Год установки

2012

Ситуация

The railway track from Dresden to Děčin (Czech Republic) experienced heavy rain that triggered several mudslides in August 2010.  They blocked the railway line and the parallel road next to the city of Königstein.

This area shows signs of weathering and slope erosion. Blocks with an edge length up to two meters are embedded and shows first signs of instabilities.

The slope has an average inclination of 30 to 35 degrees and thanks to two torrents creating Y shape can mobilize up to 100 m³ of debris flow material.

Описание

Based on data collected in September 2010, the debris flow barrier was dimensioned using our DEBFLOW software. The optimum location for the barrier was a terrain transition in a flume area with undisturbed edge structure. The embankments on both sides offered fully extensive anchoring options.

Клиент

City of Königstein

Подрядчик

Bergsicherung Freital GmbH

Защищаемый объект

Дорога, Железнодорожная линия

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Geobrugg AG

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта