Drežnica Zečev ponor Retention/Sinkhole

Камнепады, обвалы, осыпи - Drežnica Zečev ponor  Retention Sinkhole 2025

Rockfall protection barrier installed to safeguard the retention basin construction site

Камнепады, обвалы, осыпи - Drežnica Zečev ponor  Retention Sinkhole 2025

Barrier system forming a critical safety measure during excavation and concreting works

Камнепады, обвалы, осыпи - Drežnica Zečev ponor  Retention Sinkhole 2025

The temporary barrier system type GBE-500A is in place to protect workers and equipment from sudden rockfalls

Камнепады, обвалы, осыпи - Drežnica Zečev ponor  Retention Sinkhole 2025

Rockfall protection system securing the area underneath the karstified rock slope

 

Системы

 

Длина системы

60 m

 

Год установки

2025

Ситуация

At the project site, a retention basin was required to improve hydroelectric efficiency and reduce flood risk, while ensuring compliance with environmental standards (Natura 2000). 

Part of the work involves preparing the Zečevo sinkhole site, situated adjacent to a steep, karstified rock slope (up to 65°) composed of unstable limestone and dolomite. This slope is prone to sudden rockfalls due to the combined effects of gravity, weather, vegetation, and vibrations from heavy machinery, posing significant risks to workers and equipment.

Описание

To mitigate these risks during construction, a temporary GBE-500A rockfall protection barrier system has been installed. This barrier provides a secure shield against falling rocks, ensuring the safety of workers and machinery.

Страна / Регион

Хорватия

Подрядчик

Защищаемый объект

Инфраструктура

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Country Manager Southern Switzerland

Электронная почта