Швейцария
Швейцария

myGeobrugg

Камнепады, обвалы, осыпи - Chenani Nashri Tunnel Portal (2016) 2016

Finished line of GBE-500A rockfall barrier above the Chenani Nashri Tunnel

Камнепады, обвалы, осыпи - Chenani Nashri Tunnel Portal (2016) 2016

Overview of the tunnel portal construction site - GBE-500A rockfall barrier line visible on the top

Камнепады, обвалы, осыпи - Chenani Nashri Tunnel Portal (2016) 2016

GBE-500A after installation, slopes below are being cut

Камнепады, обвалы, осыпи - Chenani Nashri Tunnel Portal (2016) 2016

GBE-500A after installation, slopes below are being cut

 

Системы

 

Длина системы

80 m - 91 m

 

Год установки

2016

Ситуация

The site was initially proposed to be treated with shotcrete but persistent seepage of water which caused slope failures and cracks on the portals led the concessionaire to go for an alternate solution which does not only stabilize the slopes but also offers a green solution and allows the hydrostatic pressure to disperse. National Highways Authority of India decided to actively stabilize the tunnel portals. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

As an extra safety measure, 500 kJ barrier line was introduced and placed on one of the berms to provide extra safety besides portal stabilization. Rockfall barriers protect agains rockfalls from above stabilized area.

Описание

The GBE-500A rockfall barrier system protects the entry and exit levels of the Chenani Nashri Tunnel from all sorts of major and minor rockfalls or any falling object which could in anyway harm the tunnel portals and traffic. Thus it helps reducing the risks involved as well as the complete protection from rockfall based calamity.

See also our slope project Chenani Nashri Tunnel Portal (1)

Клиент

N.H.A.I. (National Highways Authority of India)

Подрядчик

Leighton Welspun Contractors Pvt. Ltd.

Защищаемый объект

Дорога, Инфраструктура

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

GeoData Consultants for Leighton Wellspun Contractors Pvt. Ltd.

Другие конструкции

Укрепление склонов

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта