Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

The GUARD monitoring device continuously reports the state of the barriers, here placed on a retaining rope

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

Alert list with detailed information, impact December 2023

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

Rockfall barrier with four GUARD devices installed on the retaining ropes

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

GUARD installed on a top support rope of a rockfall barrier

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

The GUARD monitoring device is placed on the top support rope

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

Detail of the expert dashboard with the corrosion calculation, which is C2 at this location

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

This rockfall event from March 4th, 2021, 11.51 h, was immediately reported via an alert to the mobile phone.

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

As mentioned before «At this location exists a very high rockfall activity.» Impact from beginning of June 2021.

Мониторинг опасных процессов - Carrière de Michelau N27 (II) 2020

The rockfall barrier did its job. The Geobrugg GUARD monitoring device reported the impact without delay.

 

Системы

 

Год установки

2020

Ситуация

The road has been protected for years by two rockfall barriers RXI-500. At this location exists a very high rockfall activity. For these reasons, the fence's material must be removed regularly, which requires regular inspections of the fence. Not only small events can fill the barrier over time. Also, large rockfall events can occur. The rockfall barriers must then be emptied immediately.

Image credits
Administration des ponts et chaussées Division de la voirie de Diekirch - GEO Benelux. Merci!

Описание

To guarantee constant monitoring, nine Geobrugg GUARD devices were installed on the two fences. With an acceleration sensor, larger rock impacts can be detected. The force measurement measures the slow filling of the fence. Furthermore, a corrosion sensor records the corrosion at this specific location, classifies it, and calculates the material service life. Installation and initial start-up were carried out independently by the customer.

UPDATE: In December 2023, the GUARD demonstrated its positive performance at barrier 1 in Michelau. Two dynamic impacts with 33 g-force and 39 g-force were detected there. The stone blocks rolled down the steep slope from a height of 80 meters. The responsible authorities were informed immediately and were thus able to check the condition of the barriers promptly and plan maintenance work. Despite the impact, the barrier was still functional, and the clearance work and repair of the secondary mesh were planned for spring 2024.

Клиент

Ministère du développement durable et des infrastructures, Adm. des Ponts et Chaussées, Division de la Voirie de Diekirch

Защищаемый объект

Дорога, Туристическая инфраструктура

Другие конструкции

Камнепады, обвалы, осыпи, Укрепление склонов

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта