Селевые потоки и микросели - Camarillo Springs Emergency 2015

One of five UX type debris flow barriers already installed - view from the valley side - type UX180-H6

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Previous debris flow caused damage to two residences

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Previous debris flowed up to the roof line.

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Another view of the damages caused by the debris flow.

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Installation of posts for the UX-180-H6 barrier - for Geobrugg's debris flow barriers only lightweight equipment is necessary

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Installation of the top support rope for the UX-180-H6 type debris flow barrier

Селевые потоки и микросели - Camarillo Springs Emergency 2015

More detailed view of fully installed debris flow barrier type VX140-H4

Селевые потоки и микросели - Camarillo Springs Emergency 2015

Debris flow barrier type VX140-H4 after the first event - visible perfect state of the already loaded protection

 

Длина системы

6 m - 25 m

 

Год установки

2015

Ситуация

After wildfires stripped the hills bare of vegetation, torrential rains during the monsoon season of 2014 created significant debris flow events impacting and devastating homes. With the 2015 El Niño approaching, preventive measures were quickly installed in the hillsides above Camarillo Springs as the primary mitigation measure against future debris flows.

Описание

The City of Camarillo hired the engineering company Kane Geotech, Inc. (Kane Geotech) to design debris flow mitigation measures. Dr. William Kane designed a plan and specified use of Geobrugg’s debris flow and shallow landslide barriers placed strategically within high risk gullies (barrancas).

At the end of 2015 the City of Camarillo hired Access Limited Construction Co., Inc. (Access Limited) to install the Geobrugg systems. Access Limited worked with Kane Geotech and Geobrugg to have the barriers installed before the rains hit. Geobrugg delivered material and Access Limited completed installation well ahead of the January 31st deadline. El Niño reached California the very next week and the Geobrugg Debris Flow barriers performed as designed.

Retention capacity:

Barranca 1 = 2,000 CY / 1,530 m³
Barranca 2 = 10,000 CY / 7,645  m³
Barranca 3 =12,000 CY / 9,175 m³
Total of 24,000 CY / 18,350 m³

Watch the clip on keyt-tv, Santa Barbara

Клиент

City of Camarillo

Подрядчик

Access Limited Construction Co., Inc.

Защищаемый объект

Строительство

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Kane Geotech, Inc.

Представитель в Вашем регионе

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / США Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Central US

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / США Regional Manager Central US

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / США Regional Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Sales Director

Инженерная защита
Geobrugg North America, LLC,Salem OR 97302 / США Sales Director

Электронная почта