Camarillo Springs emergency Debris Flow Barriers

93012, Camarillo, CA
2015
Клиент
City of Camarillo
Проектировщик
Kane Geotech, Inc.
Подрядчик
Access Limited Construction Co., Inc.
Защищаемый объект
Строительство
Высота системы
3.5м, 4.0м, 6.0м
Длина системы
6 m - 25 m
Защита от коррозии
Оцинковка, GEOBRUGG SUPERCOATING
Количество барьеров
5
Удерживающая способность
total 24,000 CY or 18,350 m³
Ситуация

After wildfires stripped the hills bare of vegetation, torrential rains during the monsoon season of 2014 created significant debris flow events impacting and devastating homes. With the 2015 El Niño approaching, preventive measures were quickly installed in the hillsides above Camarillo Springs as the primary mitigation measure against future debris flows.

Описание

The City of Camarillo hired the engineering company Kane Geotech, Inc. (Kane Geotech) to design debris flow mitigation measures. Dr. William Kane designed a plan and specified use of Geobrugg’s debris flow and shallow landslide barriers placed strategically within high risk culverts (barrancas).

At the end of 2015 the City of Camarillo hired Access Limited Construction Co., Inc. (Access Limited) to install the Geobrugg systems. Access Limited worked with Kane Geotech and Geobrugg to have the barriers installed before the monsoons hit. Geobrugg delivered material and Access Limited completed installation well ahead of the January 31st deadline. El Niño reached California the very next week and the Geobrugg Debris Flow barriers performed as designed.

Retention capacity:

Barranca 1 = 2,000 CY / 1,530 m³
Barranca 2 = 10,000 CY / 7,645  m³
Barranca 3 =12,000 CY / 9,175 m³
Total of 24,000 CY / 18,350 m³

Watch the clip on keyt-tv, Santa Barbara

Представитель в Вашем регионе

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / США
Saleh Feidi
Saleh Feidi
Regional Manager California
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / США
John Kalejta
John Kalejta
Regional Manager Central US
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / США
Bob Lyne
Bob Lyne
Regional Manager Southeast
Инженерная защита, берегоукрепление
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / США
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Инженерная защита
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Инженерная защита
Geobrugg North America, LLC
Salem OR 97302 / США